2 x 500MVA 400/132kV Erica substation and 12km 400kV d/c line loop in-out of Stikland-Pinotage 400kV line.
Installation of 400kV busbar and third 400/132kV 500MVA TRFR at Phillipi substation.
10km new Phillipi-Mitchells Plain (Erica) 400kV line.