The uMWP-1 project will be an inter-basin water transfer scheme by which the raw water will be stored in the uMkhomazi River catchment and transferred to the uMgeni River.
The project will increase the yield of the uMgeni Water Supply System by 220 million m3 per annum, increasing the current yield of the system from 394 million m3 to 614 million m3 per annum.