Search
Close this search box.

1 EB Cloete and approaches on N2_N3

Sector

Project Name

SIP Number

Project Location

Gazette Project Date

Estimated Value

Project Description

The capacity improvement of the EB Cloete Interchange on the N2 and N3,  including the widening the existing N2 dual carriageway to 6 lanes per direction outside the interchange and to 4 lanes per direction within the interchange, as well as widening of the existing N3 dual carriageway to a maximum of 7 lanes per direction (6 lanes and one auxiliary lane) outside the interchange and to 4 lanes per direction within the interchange, and major steel arch. (N2 Section  25 between Wiggins Rd (KM 16.0) to Umgeni Rd  I/C (km 20.7)  and  N3 Section 1 between Sherwood I/C (KM 8.4) to Westville viaduct (km 11.8)

Project Sponsor

Sanral

Project Timeline

Preparation

Pre-feasibility

Feasibilty

Structuring
and Design

Tender Preparation

Procurement

Construction

Completed

Project Contact

For more information contact – info@InfrastructureSA.org