The capacity improvement of the EB Cloete Interchange on the N2 and N3, including the widening the existing N2 dual carriageway to 6 lanes per direction outside the interchange and to 4 lanes per direction within the interchange, as well as widening of the existing N3 dual carriageway to a maximum of 7 lanes per direction (6 lanes and one auxiliary lane) outside the interchange and to 4 lanes per direction within the interchange, and major steel arch. (N2 Section 25 between Wiggins Rd (KM 16.0) to Umgeni Rd I/C (km 20.7) and N3 Section 1 between Sherwood I/C (KM 8.4) to Westville viaduct (km 11.8)
Project Sponsor
Sanral
Project Timeline
Preparation
Pre-feasibility
Feasibilty
Structuring and Design
Tender Preparation
Procurement
Construction
Completed
Project Contact