Search
Close this search box.

Groot Letaba River Water Development Project – Nwamitwa Dam

Sector

Project Name

SIP Number

Project Location

Gazette Project Date

Estimated Value

Project Description

The project involves the construction of a large storage dam with a gross storage capacity of approximately 187 million m3 on the Great Letaba River downstream of the confluence of the Nwanedzi River in order to provide for the ecological water reserve, domestic and irrigation water requirements. The principal components of the project include a clay core earthfill embankment, a roller-compacted concrete spillway, a stilling basin, outlet works, and the relocation of roads and bridges in the dam basin.

Project Sponsor

Department of Water and Sanitation

Project Timeline

Preparation

Pre-feasibility

Feasibilty

Structuring
and Design

Tender Preparation

Procurement

Construction

Completed

Project Contact

For more information contact – info@InfrastructureSA.org