The 2 000 MW Ministerial Determination that was gazetted on 7 July 2020, following NERSA public consultation and concurrence, has two objectives, namely to procure new generation capacity: (1) from a range of source technologies to address the electricity capacity supply gap as identified in the IRP2019; and (2) to reduce the extensive utilisation of expensive diesel-based peaking open cycle gas turbine (OCGT) generators in th e medium-to-long-term.

Project Sponsor

DMRE

Project Timeline

Preparation

Pre-feasibility

Feasibilty

Structuring
and Design

Tender Preparation

Procurement

Construction

Completed